Posts
Four 4x4 posts cut to 64-3/4" carry the structure from grade to the top plate. Setting the floor 18" up keeps the frame out of ground moisture and hands the flock the shaded space underneath.
| Part | Qty | Length | Stock | Note |
|---|---|---|---|---|
| Post A | 4 | 64-3/4" | 4x4 |
Free PDF · 22 pages · No email
16 sq ft of coop and 16 sq ft of screened run for 2-4 hens. Dimensioned drawings, a complete material list, and every cut length across 18 assembly steps. Beginner build, one weekend (10-14 hrs).
| Coop footprint | 4 ft × 4 ft (16 sq ft) |
|---|---|
| Run footprint | 4 ft × 4 ft (16 sq ft), screened |
| Overall length | 96" coop + run |
| Ridge height | 89-5/8" (12:12 gable, 24" rise) |
| Access | reach-in — 30" × 30" hinged panel |
| Interior wall height | 36" |
| Floor height | 18" off grade — screened bay underneath |
| Capacity | 2-4 hens at 4 sq ft per bird |
| Nest boxes | 2 in a 30-1/4" exterior bank |
| Roost bar | 40" total (10" per bird) |
| Ventilation | 1.5 sq ft across 1 windows |
| Floor framing | 4 joists at 16" OC, 45" clear span |
| Build time | One weekend (10-14 hrs) |
| Difficulty | Beginner |
| Materials cost | $380–$620 at 2026 prices |
The complete bill of materials. Quantities carry no waste allowance — add two or three extra 2×4s if you are new to framing.
| Material | Size | Quantity |
|---|---|---|
| 2x4 lumber | 8 feet | 67 pcs |
| 2x6 lumber (floor joists) | 8 feet | 8 pcs |
| 4x4 post | 8 feet | 6 pcs |
| 3/4" plywood | 4' x 8' | 5 pcs |
| Lap siding | 9 feet | 25 pcs (~64 sq ft of wall) |
| Corrugated metal roofing | 4' x 8' | 3 pcs |
| 1/4" hardware cloth, 19 ga | 36" roll | 37 lin ft |
| Coop windows | 18" x 23" | 1 |
| 2-1/4" wood screws | 180 pcs (2 lbs) | 2 packs |
| 1-1/2" wood screws | 100 pcs | 2 packs |
| 4" wood screws | — | 16 pcs |
| Hinges | — | 9 (4 openable parts) |
| Two-action latches | — | 5 |
| 2x2 lumber (droppings-board rails) | 8 feet | 1 pcs |
| 1x2 lumber (ramp cleats) | 8 feet | 2 pcs |
| 1x4 lumber (door Z-braces) | 8 feet | 1 pcs |
Nominal vs actual: the list uses nominal sizes (2×4), the drawings use finished sizes (1-1/2" × 3-1/2"). Check your own stock before cutting.
4 joists at 16" on centre running the short direction, rim doubled on all four sides, 45" clear span — comfortably within a 2×4's range, so no intermediate support is needed. True 16" spacing means plywood seams land on framing.
Every cut length below is computed from the same geometry that draws the PDF, so the numbers on this page and the numbers in the plan set cannot disagree.
Four 4x4 posts cut to 64-3/4" carry the structure from grade to the top plate. Setting the floor 18" up keeps the frame out of ground moisture and hands the flock the shaded space underneath.
| Part | Qty | Length | Stock | Note |
|---|---|---|---|---|
| Post A | 4 | 64-3/4" | 4x4 |
The base ring ties the four posts into a rigid square at grade. Use the 4-inch screws here — this joint carries the racking load for the life of the coop.
| Part | Qty | Length | Stock | Note |
|---|---|---|---|---|
| Base support A (front/back) | 2 | 41" | 4x4 | |
| Base support B (sides) | 2 | 41" | 4x4 | |
| Base blocking | 8 | 20-1/2" | 2x4 |
Joists sit 18" above grade on 16" centres, running the short direction across 45" in 2x6, with the rim doubled on all four sides. At 45" the 2x6 joists span well inside the 8 ft 4 in that AWC DCA6 Table 2 allows at 16-inch centres, so no intermediate girder is needed. Crown every joist up before you fasten it. Fixing the floor frame to the posts. This is the joint everything above stands on and it is the one most plans leave to guesswork. Build the rim rectangle first, square it to the diagonals, then drop it over the four posts so the rim sits ON the base ring and CLOSES the outside face of each post. Fasten each corner with two 4in structural screws driven through the rim into the post, one 1-1/2in down from the top of the rim and one 1-1/2in up from the bottom, offset from each other so they are not in the same grain line. Eight screws in total, four corners. Predrill — a 4in screw close to the end of a 2x6 will split it otherwise.
| Part | Qty | Length | Stock | Note |
|---|---|---|---|---|
| Rim joist (long sides) | 4 | 48" | 2x6 | doubled |
| Floor joist | 4 | 45" | 2x6 | 16" OC, last bay short |
Deck the floor in 3/4" plywood, notched 3-1/2" square at each corner so it drops cleanly around the posts. Fasten with 1-1/2 inch screws every 8 inches on the joists.
| Part | Qty | Length | Stock | Note |
|---|---|---|---|---|
| Floor panel | 1 | 48" x 48" | 3/4" plywood | notch corners |
Every wall is framed FLAT ON THE DECK and then stood up. That is the whole trick: you are working on a level surface, gravity holds the parts where you put them, and you can push the frame square before a single screw goes in. Studs run 16" on centre so 4-foot sheet goods break on a stud. Build order matters. Front wall, back wall, then the two end walls. The long walls go up first and get braced to the deck; the end walls then drop between them and lock the box square. If you stand a short wall first it has nothing to brace against. Every wall gets three plates: a bottom plate, a top plate, and a cap plate over the top. The cap plate is not a second top plate for strength — it is there to LAP the corner. Hold the cap plate back 1-1/2" at one end of each long wall and run it 1-1/2" long at the other, so when the end walls go in the caps interlock and tie the four walls into one ring. A butt joint at all four corners is a box that racks. Cut the bottom plate CONTINUOUS through every door opening. Frame it, stand it, brace it, and only then saw the plate out of the doorway with a handsaw. It is what keeps the wall square while you move it.
The wall you face when you walk up to the coop. It carries the door and most of the glazing. Plate length 41". Openings: access panel 30" x 34". 11 pieces in this wall. Every dimension on the drawing runs from the LEFT end of the plate to a stud CENTRE. Mark the whole plate out before you cut anything — lay the bottom and top plate side by side, square across both at once, and you cannot get the two out of step.
| Part | Qty | Length | Stock | Note |
|---|---|---|---|---|
| A Bottom plate | 1 | 41" | 2x4 | sits flat on the deck — cut out at the doors AFTER standing |
| B Top plate | 1 | 41" | 2x4 | first plate over the studs |
| C Cap plate (upper top plate) | 1 | 38" | 2x4 | laps the corner — hold back 1-1/2in one end, run 1-1/2in long the other |
| D Common stud | 2 | 36" | 2x4 | 16in OC, crown out |
| E King stud (full height, beside the opening) | 2 | 36" | 2x4 | full height, outside the jack |
| F Jack stud (carries the header) | 2 | 32-1/2" | 2x4 | carries the header, sits ON the bottom plate |
| G Header | 2 | 33" | 2x4 | two pieces + a 1/2in plywood spacer = 3-1/2in thick, flush both faces |
The nest bank hangs on the outside of this wall and the vent strip runs along the top of it, so keep the top two stud bays clear. Plate length 41". Openings: nest bank opening 30-1/4" x 13". 18 pieces in this wall. Every dimension on the drawing runs from the LEFT end of the plate to a stud CENTRE. Mark the whole plate out before you cut anything — lay the bottom and top plate side by side, square across both at once, and you cannot get the two out of step.
| Part | Qty | Length | Stock | Note |
|---|---|---|---|---|
| A Bottom plate | 1 | 41" | 2x4 | sits flat on the deck — cut out at the doors AFTER standing |
| B Top plate | 1 | 41" | 2x4 | first plate over the studs |
| C Cap plate (upper top plate) | 1 | 38" | 2x4 | laps the corner — hold back 1-1/2in one end, run 1-1/2in long the other |
| D Common stud | 2 | 36" | 2x4 | 16in OC, crown out |
| E King stud (full height, beside the opening) | 2 | 36" | 2x4 | full height, outside the jack |
| F Jack stud (carries the header) | 2 | 27-1/2" | 2x4 | carries the header, sits ON the bottom plate |
| G Header | 2 | 33-1/4" | 2x4 | two pieces + a 1/2in plywood spacer = 3-1/2in thick, flush both faces |
| H Rough sill | 1 | 33-1/4" | 2x4 | rough sill under the window |
| I Cripple under the sill | 3 | 13" | 2x4 | between bottom plate and rough sill |
| J Cripple over the header | 3 | 5" | 2x4 | between header and top plate |
The run attaches to this wall, and the pop door passes through it. Plate length 41". Openings: pop door 12" x 14". 15 pieces in this wall. Every dimension on the drawing runs from the LEFT end of the plate to a stud CENTRE. Mark the whole plate out before you cut anything — lay the bottom and top plate side by side, square across both at once, and you cannot get the two out of step.
| Part | Qty | Length | Stock | Note |
|---|---|---|---|---|
| A Bottom plate | 1 | 41" | 2x4 | sits flat on the deck — cut out at the doors AFTER standing |
| B Top plate | 1 | 41" | 2x4 | first plate over the studs |
| C Cap plate (upper top plate) | 1 | 44" | 2x4 | laps the corner — hold back 1-1/2in one end, run 1-1/2in long the other |
| D Common stud | 3 | 36" | 2x4 | 16in OC, crown out |
| E King stud (full height, beside the opening) | 2 | 36" | 2x4 | full height, outside the jack |
| F Jack stud (carries the header) | 2 | 16-1/2" | 2x4 | carries the header, sits ON the bottom plate |
| G Header | 2 | 15" | 2x4 | two pieces + a 1/2in plywood spacer = 3-1/2in thick, flush both faces |
| H Rough sill | 1 | 15" | 2x4 | rough sill under the window |
| I Cripple over the header | 2 | 16" | 2x4 | between header and top plate |
The far end. Fixed wall with a window. Plate length 41". Openings: window 18" x 23". 15 pieces in this wall. Every dimension on the drawing runs from the LEFT end of the plate to a stud CENTRE. Mark the whole plate out before you cut anything — lay the bottom and top plate side by side, square across both at once, and you cannot get the two out of step.
| Part | Qty | Length | Stock | Note |
|---|---|---|---|---|
| A Bottom plate | 1 | 41" | 2x4 | sits flat on the deck — cut out at the doors AFTER standing |
| B Top plate | 1 | 41" | 2x4 | first plate over the studs |
| C Cap plate (upper top plate) | 1 | 44" | 2x4 | laps the corner — hold back 1-1/2in one end, run 1-1/2in long the other |
| D Common stud | 2 | 36" | 2x4 | 16in OC, crown out |
| E King stud (full height, beside the opening) | 2 | 36" | 2x4 | full height, outside the jack |
| F Jack stud (carries the header) | 2 | 32-1/2" | 2x4 | carries the header, sits ON the bottom plate |
| G Header | 2 | 21" | 2x4 | two pieces + a 1/2in plywood spacer = 3-1/2in thick, flush both faces |
| H Rough sill | 1 | 21" | 2x4 | rough sill under the window |
| I Cripple under the sill | 3 | 8" | 2x4 | between bottom plate and rough sill |
A 12:12 gable — the rise equals the run, so every rafter is cut at 45 degrees and the ridge lands 24" above the top plate. Cut one rafter, test-fit it, then use it as the template for the rest. Every opposing rafter pair is tied. A pitched roof pushes outward at the eaves, and without a tie resisting that thrust the walls slowly spread and the ridge drops — the code (IRC R802.3) requires either continuous rafter ties or an engineered ridge beam, and a plain ridge board on untied rafters is neither. The ties sit at top-plate level, so they double as the framing you hang a droppings board from.
| Part | Qty | Length | Stock | Note |
|---|---|---|---|---|
| Rafter | 6 | 39-15/16" | 2x4 | 45 deg plumb cut, 6" tail |
| Ridge board | 1 | 60" | 2x4 | |
| Rafter tie | 3 | 41" | 2x4 | one per rafter pair, at top-plate level |
| Gable stud (varies) | 8 | 14-3/8" | 2x4 | cut to fit under the rafter |
3/4" plywood over the rafters, then corrugated metal sheets. Metal over shingles because it sheds snow, lasts decades and never needs a tear-off. Lap the sheets one full corrugation.
| Part | Qty | Length | Stock | Note |
|---|---|---|---|---|
| Roof deck panel | 3 | 4' x 8' sheet | 3/4" plywood | cut to fit |
| Metal roof sheet | 3 | 4' x 8' sheet | corrugated steel |
Lap siding in 9-foot courses, starting from a level chalk line at the bottom and working up. Each course laps the one below by 1 inch. Leave the window and door openings proud and trim after.
| Part | Qty | Length | Stock | Note |
|---|---|---|---|---|
| Lap siding board | 25 | 9 ft | 9 ft lap siding | 5in wide, ~1in lap |
Every opening you framed in step 5 now gets something to close it. Cut each slab a quarter inch smaller than its rough opening on all four sides — 3/4in plywood swells in the wet and a door cut to the exact opening size will bind by November. Access panel on the front wall: slab 29-1/2" x 33-1/2" in a 30" x 34" opening — a 1/4in gap all round. 2 hinges, out, hinged on the left as you face it from outside. Pop door on the left end wall (run end): slab 11-1/2" x 13-1/2" in a 12" x 14" opening — a 1/4in gap all round. 2 hinges, out, hinged on the left as you face it from outside. Every plywood door over 30in tall gets a Z-brace on the back: a rail top and bottom and one diagonal running from the bottom hinge corner up to the top latch corner. That diagonal is in compression and it is the only thing stopping the door sagging into a parallelogram. Run it the wrong way and it does nothing. Hinge side and swing. All doors here swing OUT, hinged on the left as you face them from outside. Out, because a door that opens inward sweeps the bedding and gets blocked by it; left, so every latch on the coop is in the same place and you are not hunting for it in the dark with an armful of feed.
| Part | Qty | Length | Stock | Note |
|---|---|---|---|---|
| Access panel slab | 1 | 29-1/2" x 33-1/2" | 3/4" plywood | 2 hinges, opens out |
| Access panel batten (Z-brace) | 3 | 28" | 1x4 | two rails + one diagonal, screwed from the back |
| Pop door slab | 1 | 11-1/2" x 13-1/2" | 3/4" plywood | 2 hinges, opens out |
An exterior nest bank 30-1/4" long and 17 inches deep, hung off the side wall with a hinged lid. 2 compartments — one per three to four hens. Collecting eggs from outside means you never disturb a sitting bird.
| Part | Qty | Length | Stock | Note |
|---|---|---|---|---|
| Nest bank floor | 1 | 30-1/4" x 17" | 3/4" plywood | |
| Nest divider | 1 | 17" x 14" | 3/4" plywood | |
| Nest lid | 1 | 30-1/4" x 18" | 3/4" plywood | hinged |
| Nest bank frame | 4 | 30-1/4" | 2x4 |
The pop door is a 12 x 10 inch plywood panel on a hinge with a latch, opening onto a cleated ramp down into the run. At 24-1/4" of drop the ramp wants to be about 46-1/16" long with cleats every 4 inches.
| Part | Qty | Length | Stock | Note |
|---|---|---|---|---|
| Pop door panel | 1 | 11-15/16" x 9-15/16" | 3/4" plywood | |
| Ramp | 1 | 46-1/16" x 10" | 3/4" plywood | |
| Ramp cleat | 11 | 10" | 1x2 |
The 4 ft x 4 ft screened run frames off the coop wall, 62" tall. 2 posts a side on roughly 4-foot centres, with a top rail and a mid rail so the hardware cloth has something to fasten to at every course. Set the run posts the same way you set the coop posts in step 1 — on the same pier blocks, at the same height, checked with the same string line. A run on a different footing system than the coop it hangs off will move against it and open a gap at the joint, which is exactly where a predator starts. Fixing the run to the coop: the two run rails that meet the coop are lag-bolted into the corner posts of the run-end wall, not screwed into siding. Two 3/8in x 4in lag bolts per rail, drilled with a 1/4in pilot, one 3in above the rail's bottom edge and one 3in below its top. Siding is a skin; it holds nothing.
| Part | Qty | Length | Stock | Note |
|---|---|---|---|---|
| Run post | 4 | 62" | 2x4 | |
| Run top rail | 2 | 48" | 2x4 | |
| Run mid rail | 2 | 48" | 2x4 | |
| Run end rail | 3 | 41" | 2x4 | |
| Run brace | 4 | 33" | 2x4 | 45° corner braces |
| Run door stile | 2 | 52" | 2x4 | |
| Run door rail | 3 | 26" | 2x4 |
The step that decides whether you still have a flock in two years. Quarter-inch hardware cloth over every opening, screwed through fender washers rather than only stapled. Quarter-inch, not half-inch: a least weasel squeezes through anything 1/4 inch or larger (Univ. of Kentucky Extension ID-245), and half-inch mesh — while genuinely raccoon-proof — does not stop weasels, mink or snakes. Chicken wire stops nothing: a raccoon reaches straight through the hexagonal gaps. Bury a 12-inch apron down and out around the whole run perimeter (12 inches is confirmed by three separate extension services). The windows get cloth too. An open 18 x 23 window is a hole a raccoon walks through, and it is the ventilation you rely on in summer, so it has to stay open at night. Staple a panel of cloth to the INSIDE of every window opening before the unit goes in — behind the glazing, not over it, so the window still shuts on a clean frame. Same for the continuous vent strip along the top of the back wall and the nest-bank opening.
| Part | Qty | Length | Stock | Note |
|---|---|---|---|---|
| Run walls and roof | 1 | 16 lin ft | 1/4" hardware cloth | |
| Buried apron, 12in down and out | 1 | 12 lin ft | 1/4" hardware cloth | |
| Window screens (behind every opening light) | 1 | 1 lin ft | 1/4" hardware cloth | |
| Continuous eave vent strip | 1 | 4 lin ft | 1/4" hardware cloth | |
| Nest bank opening and pop-door surround | 1 | 4 lin ft | 1/4" hardware cloth |
4 birds NEED 40 inches of perch at 10 inches each, comfortably above the 6-inch minimum the extension services set. The cut list below BUILDS 50 inches — 2 bars at 25". Those are two different numbers and this plan states both, because a plan that prints the requirement and calls it the built total is contradicting its own cut table. Use a rounded or slightly flattened bearing surface 1 to 2 inches across rather than a thin dowel or a full 3-1/2 inch flat face: it spreads footpad pressure and lowers bumblefoot risk. Set the bars 18 to 24 inches off the floor, 10 to 12 inches apart, and at least 8 inches off the wall. Stagger them like stair treads rather than stacking them, so the birds underneath do not get rained on. No bar sits over a nest box. Directly beneath the bars goes a removable droppings board — birds put out most of a night's manure while roosting, and catching it on a board you slide out and scrape turns the daily clean into a two-minute job. Never use wire for this: droppings stick to mesh and it becomes impossible to clean.
| Part | Qty | Length | Stock | Note |
|---|---|---|---|---|
| Roost bar | 2 | 25" | 2x4 | top edges eased round |
| Roost support | 4 | 14" | 2x4 | wall cleats |
| Droppings board | 1 | 27" x 24" | 3/4" plywood | removable, sealed or lined |
| Droppings board rail | 2 | 27" | 2x2 | slides out on these |
Yes — the full 22-page PDF is a free download with no email required. Every dimension, the complete material list and all 18 assembly steps are also published on this page, so you can price the build before downloading anything.
2-4 hens. At 16 square feet of coop floor this holds 4 birds at the standard 4 square feet each, and the attached run adds 16 square feet on top of the shaded bay under the raised floor.
Roughly $380–$620 at 2026 big-box lumber prices, depending on your region and what you pick for siding and roofing. The material list on this page is the full bill of materials — take it to the yard as-is.
One weekend (10-14 hrs) for someone with basic carpentry skills. Difficulty is rated beginner. Nothing in the plan needs a table saw or pocket-hole joinery — a circular saw, a drill, a level and a square cover the whole build.
Usually not. At 16 square feet of coop this normally sits under the permit threshold, which is commonly 100 to 120 square feet of footprint. Setback rules from property lines still apply in most places, so confirm those.
The floor sits 18" up on posts. That keeps the framing out of ground moisture so it does not rot, denies rats and snakes the cavity they would otherwise nest in under a grade-level floor, and gives the birds an extra 16 square feet of dry shaded space that costs nothing to build.
Different size? See all chicken coop plans, or check the size calculator first.